CAPEX & OPEX Breakdown (10MW Pilot)

Estimated capital expenditure and operational costs for a 10MW true base-load OTEC AI rig.

Category Item Estimated Cost (USD)
CAPEX Vessel Acquisition (Decommissioned Hull) $5,000,000
CAPEX OTEC Power Plant (10MW Turbines & Heat Exchangers) $40,000,000
CAPEX Cold Water Pipe & Mooring System $15,000,000
CAPEX Data & Electrical Deck (Switchgear & Cooling Manifolds) $10,000,000
CAPEX EPC, Contingency & Legal $5,000,000
Total CAPEX $75,000,000
Category Item Estimated OPEX (Annual)
OPEX Day-Shift Crew (Marine Techs, Server Admins) $1,500,000
OPEX Maintenance & Spares (Biofouling scrubbing, pumps) $1,500,000
OPEX Insurance & Admin (H&M, Political Risk, Overhead) $1,000,000
OPEX Fuel & Cooling Power Consumption $0
Total OPEX $4,000,000

Financial Returns (10MW Pilot)

Return profile based on Triple-Net (NNN) lease agreements with Tier-1 AI hyperscalers, offering a 15% discount against onshore alternatives.

TX / VA Opportunity Cost
$0.305 / kWh
Our NNN Lease (15% Discount)
$0.26 / kWh
Unlevered ROI
~4.0 Yrs
Metric Calculation Result
Total Generation (24/7) 10,000 kW × 8,760 hours 87,600,000 kWh / yr
Hyperscaler Savings $0.305 (TX) vs $0.26 (Us) ~$3,960,000 / yr Saved
Estimated Revenue 87,600,000 kWh × $0.26/kWh $22,776,000 / yr
Estimated Operating Costs (Crew, Maintenance, Insurance) -$4,000,000 / yr
Annual Net Income (Pre-Tax) $22.77M Rev - $4.0M OPEX $18,776,000 / yr
Payback Period $75,000,000 CAPEX / $18.77M Net Income ~4.0 Years

Infrastructure Economics: Solar+Battery vs OTEC

Comparing the unit economics for a 10MW 24/7 AI Data Center.

Metric Terrestrial Solar (50 MWp) Offshore OTEC (10 MW)
Baseload Power Requires 180 MWh Battery Farm ($63M) True 24/7 Thermodynamic Power ($0 Battery)
Liquid Cooling Requires Mechanical Chillers ($10M + 40% Power Load) Free 4°C Deep Ocean Water ($0)
Land / Grid Interconnection Massive acreage + 3-5 year grid queue No land required + Sovereign Mobility Hedge
Total Initial CAPEX $123,000,000 $75,000,000
Long-Term OPEX High (Battery replacement + Grid Power) Low ($4M/yr Maritime & Maintenance)